Preventive Maintenance CNC Machine DMC 210U

Authors

  • Ramadhani Prasetya Department of Mechanical Engineering Widyatama University Bandung, Indonesia Author
  • Samsul Darul Department of Mechanical Engineering Widyatama University Bandung, Indonesia Author
  • Nia Nuraeni Suryaman Department of Mechanical Engineering Widyatama University Bandung, Indonesia Author
  • Abdul Rohman Firdaus3 Department of Mechanical Engineering Widyatama University Bandung, Indonesia Author
  • Kopah Department of Mechanical Engineering Widyatama University Bandung, Indonesia Author

DOI:

https://doi.org/10.61841/1v5f3j26

Keywords:

Maintenance, machining, CNC, DMC 210U

Abstract

Maintenance is an activity to maintain or maintain factory equipment and carry out repairs or adjustments and replacements needed so that there is a satisfactory state of production operation in accordance with what is planned. The purpose of maintenance: to keep the existing system running as it should and also to be able to control costs both for prevention and repairs in case of damage. The portal series type machine of DMC 210 U is a large, 5 axis / 5 axis machine that uses a stable bridge type structure to achieve high accuracy and dynamic performance. This model allows 5-axis / 5-axis machining with one arrangement, contributing to the increase in customer productivity, which is equipped with a high-speed pallet converter, which allows the operator to make arrangements for the next process during the production process. The methodology used in this study is to follow the stages of the process of preventive maintenance carried out on the DMC 210U CNC machine. Based on the results of handling including the Electronic and control systems, Axis, Spindles, APCs, ATCs, Hydrolic Units, Lube and Coolants, Cooling Systems, and Pneumatic Units, it can be concluded that the DMC 210 U CNC Machine is in good condition in the sense of not experiencing damage

 

Downloads

Download data is not yet available.

References

[1] Ebeling, Charles E., An Introduction to Reliability and Maintainability Engineering. McGraw-Hill Book, Singapore, 1997.

[2] Shi, X., Dini, A., Shao, Z., Jabarullah, N.H. & Liu, Z. (2019) Impacts of photovoltaic/ wind turbine/ microgrid turbine and energy storage system for binding model in power system, Journal of Cleaner Production, 226, 845- 857.

[3] Soesetyo, Penjadwalan Predictive Maintenance dan Biaya Perawatan Mesin Pellet di PT Charoen Pokphand, Indonesia – Sepanjang, 2014.

Downloads

Published

30.09.2020

How to Cite

Prasetya, R., Darul, S., Suryaman, N. N., Firdaus3, A. R., & Kopah. (2020). Preventive Maintenance CNC Machine DMC 210U. International Journal of Psychosocial Rehabilitation, 24(7), 2922-2936. https://doi.org/10.61841/1v5f3j26