Storage Allocation In Finished Goods Warehouse (Case Study Of Sock Industry In Bandung)

Authors

  • Nitta Fitria Anggraeni Nill Author
  • Dilla Ayu Maharani Nill Author
  • Kristina Sihombing Nill Author
  • Gustian Adhitya Prayogi Nill Author
  • Verani Hartati Nill Author

DOI:

https://doi.org/10.61841/qc7b0n08

Keywords:

Warehouse, Storage Allocation, Class-Based (ABC),, First In First Out (FIFO)

Abstract

Warehouse is a temporary storage of goods, such as raw materials, work in progress or finished goods. The warehouse has a different cycle time for each item stored. All the problem that arises in warehouse such as stacking of goods, improper allocation of storage, and time for picker to collect goods. PT SCN is a company that engaged in the production and distribution of fashion products. The high level of production in this company has resulted in the unorganized storage of warehouse storage. Allocation storage of goods in warehouses must be considered carefully so as not to reduce the quality of the goods stored. Based on these problems, the purpose of this research is to be a problem solving of storage allocation. These problems can be solved by using class-based (ABC) method and First In First Out (FIFO) method. This research uses monthly demand data to get categories and avoid inventory buildup. The results of this research are the arrangement of goods in the forward area and block stage based on the capacity along with the specified categories.

 

Downloads

Download data is not yet available.

References

[1] J. Warman, Manajemen Pergudangan, Jakarta, Indonesia: Pustaka Sinar Harapan, 2004.

[2] D. E. Mulcahy, Warehouse Distribution & Operations, New York: McGraw Hill, 1994.

[3] R. L. Francis, L. F. M. Jr and J. A. White, Facility Layout And Location: An Analitical Approach, New Jersey:

Prentice-Hall International, 1992.

[4] A. E. Rahmadhika and N. U. Handayani, "Perbaikan Tata Letak Penempatan Barang Di Warehouse Benang

Menggunakan Metode ABC Analysis," vol. 06, no. 1, 2017.

[5] D. S. Pamungkas and N. U. Handayani, "Usulan Perbaikan Tata Letak Penempatan Bahan Baku Di Gudang

Menggunakan Metode ABC Analysis Pada Pt Sandang Asia Maju Abadi Semarang," vol. 07, no. 2, 2018.

[6] M. Zaenuri, "Evaluasi Perancangan Tata Letak Gudang Menggunakan Metode Shared Storage di PT.

International Premium Pratama Surabaya," vol. 15, no. 2, 2015.

[7] J. M. Apple, Tata Letak Pabrik dan Pemindahan Bahan, Bandung: ITB, 1990.

[8] J. A. Tompkins and J. D. Smith, The Warehouse Management Handbook, Mc Graw-Hill Book Company, 1990.

[9] R. G. Schroeder, S. M. Goldstein and M. J. Rungtusanatham, Operation Management : Contemporary Concepts

and Cases., Mc Graw-Hill, 2010.

[10] S. Heragu, Facilities Design, PWS. Publishing Company, 1997.

Downloads

Published

30.09.2020

How to Cite

Anggraeni, N. F., Maharani, D. A., Sihombing, K., Prayogi, G. A., & Hartati, V. (2020). Storage Allocation In Finished Goods Warehouse (Case Study Of Sock Industry In Bandung). International Journal of Psychosocial Rehabilitation, 24(7), 2828-2837. https://doi.org/10.61841/qc7b0n08