APPLICATION OF EWMA CONTROL T-CHART ON POWDER COATING PAINT PRODUCTION
DOI:
https://doi.org/10.61841/9a1d8h11Keywords:
EWMA T-charts, Short Run Control Charts, T-chartsAbstract
Short-run production control charts have been evolved from simple nominal and target value charts to t-charts and EWMA t-charts as suggested on a constant sampling interval. The standard Shewart chart is not appropriate to be implemented on company “X”, that produces powder coating paint, which production process runs on small batches at a limited production time. This paper discusses the application of t-charts and EWMA t-charts in comparison with I-MR and Z-MR charts on company X’s production line. We have found that t-charts and EWMA t-charts are more sensitive to detect the out of control condition.
Downloads
Published
Issue
Section
License
Copyright (c) 2020 AUTHOR

This work is licensed under a Creative Commons Attribution 4.0 International License.
You are free to:
- Share — copy and redistribute the material in any medium or format for any purpose, even commercially.
- Adapt — remix, transform, and build upon the material for any purpose, even commercially.
- The licensor cannot revoke these freedoms as long as you follow the license terms.
Under the following terms:
- Attribution — You must give appropriate credit , provide a link to the license, and indicate if changes were made . You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
- No additional restrictions — You may not apply legal terms or technological measures that legally restrict others from doing anything the license permits.
Notices:
You do not have to comply with the license for elements of the material in the public domain or where your use is permitted by an applicable exception or limitation .
No warranties are given. The license may not give you all of the permissions necessary for your intended use. For example, other rights such as publicity, privacy, or moral rights may limit how you use the material.