In this paper, we propose to solve the flow shop scheduling problem using Branch and Bound method. This paper presents an algorithm with the help of branch and bound approach for a flow shop scheduling problems consisting of 4 jobs and 4 machines in which the processing time as Neutrosophic trapezoidal fuzzy numbers which are further converted in to crisp value using graded mean ranking method. Numerical example is given to illustrate the study of solvingflow shop scheduling under Neutrosophic trapezoidal fuzzy number using branch and bound technique.

Downloads

Download data is not yet available.

References

[1] G. Ambiga and G. Uthra, Branch and Bound Technique in flow shop scheduling using fuzzy processing times, vol 8, No. 2, 2014, 37-42

[2] A.P.G. Brown and Z.A. Lominicki (1966), some application of the branch and bound algorithm to the machine scheduling problem, Operational research Quartely, 17(1966)173-182.

[3] D. Gupta (2011) Application of branch and bound technique for n x 3 flow shop scheduling in which processing time associated with their respective probabilities, Mathematical Modeling and Theory, 2(1)(2011) 31-36.

[4] E.Ignall and L.Schrage(1965), Application of the branch and bound technique to some flow shop scheduling problem. Operations Research, 13(3)(1965 400-412.

[5] T. Izzettin and S.Erol, Fuzzy branch and bound algorithm for flow shop scheduling, Journal of Intelligent Manufacturing, 15(2004) 449-454.

[6] P Sanuja and S. Xueyan, A new approach to two machine flow shop problem with uncertain Processing time Optimization and Engineering 2006, 7(3), 329-343.

[7] Said Broumi, Assia Bakali, Mohamed Talea, Florentin Smarandache, Luigevladareanu, Shortest path problem under Triangular Fuzzy Neutrosophic Information.

[8] S.Santhi and K.Selvakumari, Flow shop scheduling problem under branch and bound method in neutrosophic environment, Vol 7 ISSN 2279-543X

[9] K. Thangavelu, G. Uthra, S. Shunmugapriya(2016), Optimal Solution of Three Stage Fuzzy flow Shop Scheduling Problem Using Branch and Bound Technique, Global Journal of Pune and Applied Mathematics (GJPAM) ISSN 0973-1768 volume 12, Number1.

[10] L.A. Zadeh Fuzzy sets information and computation 8(1965), 338-353

Downloads

Published

30.06.2020

How to Cite

Santhi , S. (2020). Flow Shop Scheduling Problem in Neutrosophic Environment Using Trapezoidal Fuzzy Numbers. International Journal of Psychosocial Rehabilitation, 24(4), 4921-4926. https://doi.org/10.61841/332ksm64