Assessment of Integral Indicators of the Surface Skating of the Rail Head in Sections of Speed and High Speed Train Traffic

Authors

  • K.S. Lesov Tashken Trail Way Engineering Institute, Tashkent, Uzbekistan. Author

DOI:

https://doi.org/10.61841/2gpw1a34

Keywords:

Rail, Assessment, , Experimental Plot, Undulating Wear, , Arithmetic Mean Value, RMS Deviation.

Abstract

The article discusses the condition of the surface skating of the rail head in sections of high-speed and high-speed train traffic to assess the integral indicators of the surface skating of the rails (long waves, medium waves, short waves).

Downloads

Download data is not yet available.

References

1. Irregularities on the surface of rolling of the rail head, in the experimental sections of high-speed and high- speed train traffic, have been identified to evaluate the integral indicators of the surface of rolling of the rails (long waves, medium waves, short waves).

2. The arithmetic mean values of deviations of the unevenness depths from the fragments of the plots are determined, graphical interpretations in the form of histograms are constructed.

3. The root-mean-square deviations of the depths were calculated according to the lengths of the experimental plots to assess the characteristics of irregularities on the rails.

REFERENCES

[1] Lesov KS, Mirakhmedov MM, Ibragimov NN, Ruziev RV, IsmailovKh.D. Development of high-speed train traffic in Uzbekistan as an element of the competitiveness of the transport system and the realization of transit potential. / Materials of the 5th International Symposium of Railway Universities in Europe and Asia “Harmonization and Integration of Education Systems of Transport Universities in Europe and Asia”. - Almaty: 2012. S.132-135.

[2] The concept of the development of high-speed and high-speed movement on iron roads of the Republic of Uzbekistan.

Design and survey institute for transport of Boshtransloyikha OJSC. - Tashkent: 2009.

[3] Krysanov L.G. Features of profile grinding of rails / L.G. Krysanov, V.A. Reykhart, A.Yu. Abdurashitov, V.M. Grigoriev // Way and track economy 1998 - No. 6 - p. 8-10.

[4] Kozyrev A. I., Alizhan A., Aspects of the negative impact of wave-like rail wear during high-speed and high-speed train traffic / Tr. VIII Scientific Pract. conf. “Train safety. M., MIIT 2007, p. II-6, II-7.

[5] Alizhan A., Adilkhanov E.G. Investigation of the effect of wave-like irregularities in the rolling surface of rails on the dynamics of rail crews. // Bulletin of KazATC. - 2008. –№ 6. –S. 80-85

[6] Kreinis Z. L. Maintenance and repair of the railway track: A textbook for technical schools and colleges of railway transport / Z.L. Kreinis, N.P. Korshikov. M.: UMK MPS of Russia, 2001 .-- 768 p.

[7] Timofeeva L.A., Ogulchanskaya N.R. The causes of wave-like wear of the rolling surface of a rail of a railway track and methods for its elimination / L.A. Timofeeva, N.R. Ogulchanskaya. ІКЗТТ Magazine, 2015, No. 3.С. 56-58.

[8] Lesov KS, Ph.D., Associate Professor, Kuznetsov II, Senior Researcher, SamandarovKh.O., Ph.D., Kenzhaliev M.K., m .n.s Problems of the rolling surface of the rail head on high-speed and high-speed sections of railways of Uzbekistan TemirYollari JSC. VestnikTashIIT 2019. No 3 / Tashkent 2019.

[9] Albrecht V.G. Profile grinding of rails / V.G. Albrekht, A.P. Galunin, L.G. Krysanov and others // Way and track economy. 1995.-№5. - p. 12-18.

[10] Krysanov L.G. Efficiency of profile processing of rails // Path and track facilities 1996 - No. 12 - p.2-6.

[11] JSC "Russian Railways" Order No. 388r of February 22, 2011, "On the Enactment of Technical Instructions for Polishing Rails". The order of Russian Railways dated December 29, 2017 - 40 s.

[12] Instructions for grinding and milling rails on the way and stationary conditions: approved. Decree of JSC Russian Railways No. 3185r of December 29, 2014. M., 2014.66 s.

[13] Technical instructions for grinding rails. Russian Railways. –M .: IKC "Akademkniga", 2004. - 39 p.

[14] Chernyshev M.A. Practical methods of calculating the path / M.A. Chernyshev - M., Transport, 1967.

[15] Ilyinykh, A.S. Scientific and methodological foundations of a high-performance technology for grinding rails in a railway track / A.S. Ilyinykh // Vestnik of SSTU. - 2013 – №1. -FROM. 82–88.

[16] A.V. Matafonov, A.N. Pyko, A.S. Ilyinykh Technological support for the quality of the surface of rails during grinding in a railway track. / Matafonov A.V., Pyko A.N., Ilyinykh A.S. // Bulletin of SUSU. 2015. Volume 15. -№1. - from 80- 92.

[17] A.S. Ilyinykh, V.A. Aksyonov, E.O. Yurkova, A.V. Matafonov Assessment of the organizational and technological reliability of the production process of grinding rails based on simulation modeling / A.S. Ilyins, V.A. Aksyonov, E.O. Yurkova, A.V. Matafonov // Bulletin of SSTU. - 2019. –№ 4. –S. 40-45.

[18] Kozyrev A.I. Types and characteristics of wavy irregularities of rails / A.I. Kozyrev, A. Alizhan // Problems and prospects for the development of rolling stock in the Republic of Kazakhstan and ways to solve them: Mat. scientific- practical conf. Almaty, Inform-Arna, Almaty, 2008. - 148 p.

Downloads

Published

30.06.2020

How to Cite

Lesov, K. (2020). Assessment of Integral Indicators of the Surface Skating of the Rail Head in Sections of Speed and High Speed Train Traffic. International Journal of Psychosocial Rehabilitation, 24(4), 3858-3863. https://doi.org/10.61841/2gpw1a34