Public Private Partnership for Affordable Housing in Abuja Nigeria: A Review

Authors

  • Yahaya Ahmed Faculty of Built Environment and surveying, Department of Property Management, Universiti Teknologi Malaysia, Skudai, Johor, Malaysia. Author
  • Ibrahim Atan Bin Sipan Faculty of Built Environment and surveying, Department of Property Management, Universiti Teknologi Malaysia, Skudai, Johor, Malaysia. Author

DOI:

https://doi.org/10.61841/xcs8gt48

Keywords:

Affordable Housing, Public Private Partnership, Abuja, Nigeria

Abstract

A public-private partnership was recently recognized as an option to end the current crisis of housing shortages and affordable housing in the country by the Nigerian government in line with UN recommendations. This study aims to identify the challenges of PPP for the provision of affordable housing in Abuja. The study based on review found that PPP has not made any significant contribution in providing affordable housing; rather, it is suddenly changing towards providing housing for high- and middle-income earners. The paper reveals that the challenge of PPP for affordable housing provision is the acquisition and access to land, high dependence of foreign building materials, adequate housing finance, difficulty of accessibility to mortgage facilities and land titles, poor infrastructure facilities, and cost recovery, among others. It therefore suggests that the government should provide land at no cost, encouraging the use of local building materials at a low price, providing more financial institutions at little or no interest, establishing an effective mortgage system, and incorporating assisted self-help and incremental housing into the public-private housing delivery system to ensure better results. Consequently, there is a possibility for the government to develop a framework for PPP to achieve its dream by providing affordable housing in Abuja, Nigeria. 

Downloads

Download data is not yet available.

References

[1] Abdul-Aziz. A-R. &Kassim, PSJ, 2011. Objectives, success and failure factors of housing public e private

partnerships in Malaysia. International, 35(1), pp150-157.

[2] Abdul-Aziz. A-R., 2012. Control mechanisms exercised in Malaysian housing public-private partnerships.

Construction management and economics, 30(1), pp.37-55.

[3] Abdul-Aziz. A., 2010. Housing private public partnerships: perspectives from the government Agencies. In

NAPREC conference. Pp. 1-24.

[4] Abdullahi, B.C. & Abd-Aziz, N.A., 2011. The roles of private sector participation in achieving anticipate

outcomes for low-come group: A comparative analysis of housing sector between Malaysia and Nigeria. African

journal of business management, 5(16), pp.6859-6890.

[5] Adams, J., Young, A. & Zhihong, W. (2006) Public – private partnerships in China: rational System and

constraints, International Journal of Public Sector Management, 19(2), pp. 384–396.

[6] Adediji, Y. M. D. (2006). Affordable and Functional Housing in a Developing Economy: A case study of

Nigeria. Journal of Land Use and Development Studies, Vol. 2 (1), 113-120.

[7] Ade-Kunle Ifesanya, 2012. The Role of Government agencies in urban housing delivery insufficient political

will and ineffective housing administration in lagos metropolis - case study of Ajegunle, Lagos. A thesis

submitted for the requirement of the award of PhD in Urban Studies at the Institute for European Urban Studies,

Faculty of Architecture, Bauhaus University, Weimar, Germany.

[8] Ademiluyi, A.I. & Raji, B.A. (2008) Public and private developers as agents in urban housing delivery in subSaharan Africa: the situation in Lagos State. Humanity & Social Sciences Journal, 3(2), pp.143–150.

[9] African Ministerial Conference on Housing and Urban Development (AMCHUD) (2005) Communiqu´e on

‘financing housing and urban development: with special reference to Africa’ issued at the end of the conference

31 January–4 February, Abuja, Nigeria.

[10] Agbola, T. (1993) Manpower problems in the building industry. IN Taylor, R. W. (Ed.) Urban development in

nigeria. Avebury, Aldershot.145-153

[11] Agbola, T. and Jinadu, A. (1997) Forced eviction and forced relocation in Nigeria: the experience of those

evicted from Maroko in 1990, Environment and Urbanization 9 (271), 270-288.

[12] Agbola, T. (1998). The Housing of Nigeria: a review of policy Development and implementation. Research

report, 14, Ibadan, Development Policy Centre.

[13] Agbola, T. (2005) The Housing Debacle, Inaugural Lecture Delivered at the University of Ibadan, Ibadan, 4

August.

[14] Agrawal, R., 2010, successful delivery of public –private partnership for infrastructure development. Jaypee

institute of information technology .neada India.

[15] Ajibola G.B &Sanmi A. (2015). Housing Rehabilitation Strategy as Enabling Approach for Development of

Rural Housing Poverty in Nigeria. World Journal of Social Sciences and Humanities Vol. 1, No. 1, 2015, pp 11-

17. doi: 10.12691/wjssh-1-1-3.

[16] Akeju, A. A. (2007) Challenges to Providing Affordable Housing in Nigeria. Paper Presented at 2nd Emerging

Urban Africa International Conference on Housing Finance in Nigeria. Held at SheuYa-adua Centre, Abuja,

Nigeria. October 17th – 19th 2007.

[17] Akintoye A. et al., 2003. Achieving best value in private finance initiative project procurement. Construction

management and economics, 21(5), pp 461-470.

[18] Akintoye,A., 2015. Ppp: variations and country contexts. Keynote address. In environmental design and

management international conference (EDMIIC2015) at obafemi Awolowo University. March 2015. IIE-Ife,

Nigeria.

[19] Ameyaw, E.E. and Chan, A.P. (2015), “Risk ranking and analysis in PPP water supply infrastructure projects: an

international survey of industry experts”, Facilities, Vol. 33 Nos 7/8, pp. 428-453.

[20] Ameyan, E. E. and Chan, A.P.C., 2015. Implementing PPP Water Supply Projects in Ghana. African Journal of

Applied Research, 1(1), pp.453-69.

[21] Andriof, J. & Waddock, S. (2002) Unfolding stakeholders engagement, in: J. Andriof, S. Waddock, B. Husted

&S. Rahman (Eds) Unfolding Stakeholder Thinking: Theory, Responsibility and Engagement, pp. 19–42

(Sheffield: Greenleaf). Aribigbola, A. (2008) Housing policy.

[22] Aribigbola, A. 2008. Housing Policy Formulation in Developing Countries: Evidences of Programme

Implementation from Akure, Ondo State Nigeria. . Journal of Human Ecology 23, 125-134.

[23] Arthur Andersen and Enterprise LSE, (2000). Value for Money Drivers in the Private Financial Initiative, the

Treasury Task Force, 2018].

[24] Ar M.M. and Gab-Allah A.A. (2002) Problems Facing Parties Involved in Build, Operate, and Transport Projects

in Egypt . JOURNAL OF MANAGEMENT IN ENGINEERING / OCTOBER 2002 /.

[25] Association of Consultin engineering Companies, 2015. Understanding Public Private Partnerships in Canada.

Report, p.36. Access on: 12 october, 2018 at http://www.acec.ca/.

[26] Australian Housing and Research Institute (AHURI) (2004) Measuring housing affordability, AHURI Research

and Policy Bulletin, (45), pp. 1–4.

[27] Awodele,O.A.ogunsemi, D.R. & rotimi, JOB. 2008. Private participation in infrastructure (ppI) development in

developing economies-the Nigerian experience. In the construction and building research conference of the

royal institution of chartered surveyors. Dublin.

[28] Awotona, A. (1990). Nigerian government participation in housing: 1970–1980. Habitat International, 14 (10),

17–40.

[29] Bana, P. M. (1991). Housing the urban poor in Nigeria. The Nigerian Institute of Architects Journal, 6(1), 22–25.

[30] Batley, R. Batley, R. (1996) Public–private relationships and performance in service provision. Urban Studies,

33(4–5), pp. 723–751.

[31] Bovaird, T. (2004) Public–private partnerships: from contested concepts to prevalent practices, International

Review of Administrative Sciences, 70(2), pp. 199–215.

[32] Brown, A., Allison, O., & Luo, J. (2006). The suitability of Public-Private Partnership in the provision of

sustainable housing in China. World Review of Entrepreneurship, Management and sustainable Development,

1(1/2), 101–124.

[33] Carol Jacobson, Sang Ok Choi (2008), public works and public-private partnerships. International Journal of

Public Sector Management Success factors:

[34] Cartlidge, 2006, Public Private Partnership in Construction.ISBN13:978-0-415-36621 2(HBK).

https://www.amazon.com/Public-Private-Partnerships-Construction-Cartlidge/dp/B007YZVSZK.

[35] Chan. A.P.C. et al., 2010.crical success factor for PPs in infrastructure Developments: Chinese perspective.

Journal of construction. Engineering and management, 136(5), pp.484-494.

[36] Cheung, Esther, Chan, Albert, & Kajewski, Stephen L. (2012) Factors contributing to successful public private

partnership projects: comparing Hong Kong with Australia and the United Kingdom. Journal of Facilities

Management, 10(1), pp. 45-58.

[37] Chou, J. S., & Pramudawardhani, D. (2015). Cross-country comparisons of key drivers, critical success factors

and risk allocation for public-private partnership projects. International Journal of Project Management, 33(5),

1136-1150.

[38] Dewulf, G., mahalingam, A & jooste, S. 2011. The transition towards a sustainable PPP regime in T. M., tooled,

Ed engineering project organization conference Colorado, p 14.

[39] El –sawalhi, N.I.,& mansour, M.A., 2014 preparation critical success factor for public private partnership (ppp)

projects in Palestine. Journal of engineering research and technology, 1(2), pp.52-57.

[40] Fasakin, J. O. (1998). Cooperative housing; the concept, experience and applicability to Nigeria’s socio

economic milieu’. Seminar paper presented at the Federal University of Technology, Akure.

[41] Federal Republic of Nigeria (1991) National Housing Policy (Lagos: Federal Government Press).

[42] Federal Republic of Nigeria (2009). National Policy on Public Private Partnerships. Abuja: Infrastructure

Concession Regulatory Commission (ICRC).

[43] Frilet, M. (1997). Some Universal Issues in BOT Projects for Public Infrastructure, The International

Construction Law Review. 14 (4). pp.499-512.

[44] Fruet, G.M. (2005) The low-income housing cooperatives in Porto Alegre, Brazil: a State/Community

Partnership, Habitat International, (29), 300–324.

[45] Gentry B. and Fernandez, L. (1997) Evolving Public-Private Partnerships: General Themes and Urban Water

Examples. Globalisation and the Environment: Perspectives from OECD and Dynamic Non-Member Economies.

OECD, Paris. pp.19-25.

[46] Ibem, E. O. 2010. An Assessment of the Role of Government Agencies in Public-Private Partnerships in Housing

Delivery in Nigeria. Journal of Construction in Developing Countries, 15, 23-48.

[47] Ibem, E. O. (2011a). Public-Private Partnership (PPP) in housing provision in lagos megacity region, Nigeria.

International Journal of Housing Policy, 11(2), 133–154.

[48] Ibem, E. O. (2011b). The contribution of Public-Private Partnerships (PPPs) to improving accessibility of lowincome earners to housing in southern Nigeria. Journal of Housing and the Built Environment, 26(2), 201–217.

[49] Ibem, E.O; Anosike, M.N. and Azuh, D.E. (2011). Challenges in Public Housing Provision in the Post

Independence Era in Nigeria. International Journal of Human Sciences 8 (2), 421-443.

[50] Ibem, E. O. & Aduwo, E. B. 2012. Public-Private Partnerships (PPPs) in Urban Housing in Nigeria: Evidence

from Ogun State. International Journal Of Architecture and Urban development, 2.

[51] Hammami, M., Rushashyankiko, J.J. & Yehoue, A. (2006) Determinants of public–private participation in

infrastructure, IMF Working Paper. 2018.

[52] Hardcasle, C. et al., 2005. Critical Success Factors for PPP/PFI Projects in the UK Construction Industry: A

Factor Analysis Approach. Construction Management and Economics, 23(5), pp. 1-9.

[53] Hair et al, 2014. Partial least squares structural equation modeling (PLS-SEM) An emerging tool in business

research. European Business Review Vol. 26 No. 2, 2014 pp. 106-121.

[54] Ham H.V. & Koppenjan J. (2010). Building Public-Private Partnerships: Assessing and managing risks in

port development. Public Management Review ISSN 1471–9037 print/ISSN 1471–9045 online Vol. 4 Issue 1

2002 593–616.

[55] Helmy. M.A., 2011 investigating the critical success factors for ppp projects in kuwau royal institute of

technology, Stockholm.

[56] Hemming,R.,2006a., public- private partnership in realizing the potential for profitable investment in Africa.

Tunis, Tunisia: organized by the IMF institute and the joint Africa institute, p.15.

[57] Ikekpeazu, F. (2004). New trends in low-cost housing delivery systems in Nigeria: An overview of the Public–

Private Partnership approach. Housing Today-The Journal of the Association of Housing Corporation of Nigeria,

1(8), 30–36.

[58] Ismail A.G., 2013. Public Private Partnerships: lesson from Sukuk. Islamic Research and Training Institute P.O.

Box 9201, Jeddah 21413, Kingdom of Saudi Arabia.

[59] Ismail S, 2014 Critical success factors of public private partnership (PPP) implementation in Malaysia. AsiaPacific Journal of Business Administration Vol. 5 No. 1, 2013 pp. 6-19

[60] Jacobson C. & Choi S.o. , (2008) "Success factors: public works and public‐private partnerships", International

Journal of Public Sector Management, Vol. 21 Issue: 6, pp.637-657.

[61] Jamil, D., 2004b. Success and failure mechanisms of public private pasrtnership (PPPs) in Developing countries,

The International Journal of Public sector Management, 18(5), pp.414-430.

[62] Jefferies, M., Gameson, R. and Rowlinson, S. (2002). Critical Success Factors of the BOOT Procurement

System: Reflection from the Stadium Australia Case Study. Engineering, Construction and Architectural

Management. 9 (4). pp.352-361.

[63] Jimiez, E. & Kieve, H. (1983) Progressive development and affordability in the design of urban shelter

programme, World Bank Working Paper 560, p. 83.

[64] Kanter, R. M. (1999). From Spare Change to Real Change, Harvard Business Review. Boston. 77 (2). pp.122-

132.

[65] Kleinbaum, D.G., Kupper, L.L. & Muller, K.E., 1998. Applied Regression Analysis and other Multivariable

Methods. Boston, Mass.: PWS-Kent Pub. Co., c1988.

[66] Klijn, E.H. & Koppenjan, J.M. (2000) Public management and policy networks: foundation of a network

Approach to governance. Public Management, 2(2), pp. 135–158.

[67] Kopp, J. C. (1997). Private Capital for Public Works: Designing the Next-Generation Franchise for PublicPrivate Partnerships in Transportation Infrastructure. Master Thesis, Department of Civil Engineering,

Northwestern University, USA.

[68] Kwak, Y.H., chih Y. & ibbs, C.W., 2009. Towards a comprehensive understanding_ of public private

partnerships for infrastructure development California management review, 51(2), pp. 51-78.

[69] Lagos State Government (2008) Lagos State Government PPP initiatives, PPP Brochure (Ikeja: Ministry Of

Finance). Available at http://www.lagostate.gov.ng (accessed 14 May 2018).

[70] Leke, A., Fiorini, R., Dobbs, R., Thompson, F., Suleiman, A. & Wright, D. 2014. Nigeria’s renewal. delivering

inclusive growth in Africa’s largest economy. McKinsey Global Institute.

[71] Li, B. et al., 2005a. Critical success factor for PPP/PFI projects in the UK construction industry construction

`Management and economics. 23(5), pp. 459-471.

[72] Li, B.Akintoye, A. 2008. An Overview of Public Private Partnership. In A. Akintoye, M. Beck, & C. Hardcasle,

eds. Public-Private Partnerships. Oxford, UK: Blackwell Publishing Inc., pp.1-30.

[73] Mabogunje, A. (2001) Nigeria and the Good Urban Governance Campaign, Report on Good Urban Governance.

Abuja, Federal Ministry of Works and Housing.

[74] Marava, N. & Getimis, P. (2002) Public–private partnerships in urban infrastructure: Athens ring-road case

study. First Draft of Paper presented at the EURA Conference Urban and Spatial European Policies: Levels of

Territorial Government, 18–20 April 2002, Turin.

[75] Mayaki, S. S. (2003). Private sector involvement in mass housing: The way forward. Housing Today. Journal of

the Association of Housing Corporations of Nigeria, 1(7), 31–34.

[76] Mazouz, B., Facal, J., & Viola, J. (2008). Public-Private Partnership: Elements for a project-based management

typology. Project Management Journal, 39(2), 98–110.

[77] Mba, H. C. (1992). The Dilemmas of housing programmes in Nigeria. In H. C. Mba, J. U. Ogbazi, & K. O. Efobi

(Eds.), Principles and practice of urban and regional planning in Nigeria (pp. 52–62). Awka: Mekslink

Publishers Nigeria.

[78] Morka, F.C. (2007) A place to live: a case study of the Ijora-Badia community in Lagos, Nigeria. Case Study

Prepared for Enhancing Urban Safety and Security Global Report on Human Settlement.

[79] Miraftab, F. (2004) Public–Private Partnerships: Trojan horse of neoliberal development? Journal of Planning

Education and Research, 24(1), 89–101.

[80] Mukhija, V. (2004). The contradiction in enabling private developers of affordable housing: A cautionary case

from Ahmedabad, India. Urban Studies, 41(11), 2231–2244.

[81] Mustafa Emre Civelek 2018 Essentials Of Structural Equation Modeling.

[82] National Audit Office (2001). Managing the Relationship to Secure a Successful Partnership in PFI Projects.

National Audit Office, London. HC375.

[83] Norusis, M., 2008. SPSS 16.0 Advanced statistical procedures companion, prentice hall press. 2018].

[84] Payne, G. (Ed.). (1999). Making common ground: Public–Private Partnerships in land for housing. London:

Intermediate Technology Publications.

[85] Qiao, L., Wang, S., Tiong, R. and Chan, T. (2001). ‘Framework for critical success factors of BOT projects in

China’. The Journal of Structured Finance, 7: 1, 53-61.

[86] Obeng-Odoom, F. (2009). Has the habitat for humanity housing scheme achieved its goal? A Ghanaian case

study. Journal of Housing and the Built Environment, 24, 67–84.

[87] Oduwaye, A.O. (1998). Beyond structural adjustment programme: Strategic options for increasing housing stock

in Nigeria.

[88] Ogu, V. I., & Ogbuozobe, J. E. (2001). Housing policy in Nigeria: Towards enablement of private housing

development. Habitat International, 25(4), 473–492.

[89] Olajide, O. (2010) Urban Poverty and Environmental Conditions in Informal Settlements of Ajegunle, Lagos

Nigeria, in Schrenk, M., Popovich, V. and Zeile, P. (eds) Real Corp 2010.

[90] Omole, F. K. (2001). Basis issues in housing development. Ondo: FemoBless Publishers.

[91] Ong, H.C. & lenard, D., 2002.can private finance be applied in the provision of housing : In FIG XXII

international congress. Washington, D.C., p. 13.

[92] Ong, H. C. and Lenard, D. (2002). Partnerships between Stakeholders in the Provision of and Access to

Affordable Housing in Malaysia. Paper presented at FIG XXII. International Congress held at Washington,

D.C., USA, April 19–22, 2002.

[93] Onibokun, A. G. (1982) Issues in Nigerian Housing, Ibadan, NISER.

[94] Oruwari, Y. (1993). Affordability of urban housing in Nigeria. The Nigerian Institute of Architects Journal,

8(1&2), 26–30.

[95] Owei, O. (2007) Distortions of the urban land markets in Nigerian cities and the implications for urbangrowth

patterns; the case of Abuja and Port Harcourt. Paper presented at the Fourth Urban Research Symposium.

[96] Oruwari, Y. (2006). Lest we forget: The poor people need housing in the urban areas in Nigeria too—A

reflection of low-income housing provision. In A. I. Okewole, et al. (Eds.), The built environment: Innovation

policy and sustainable development (pp. 2–9). Ota-Nigeria: Department of Architecture, Covenant University.

[97] Pessoa, A. (2006) ‘Public–private sector partnerships in developing countries: prospects and drawbacks,

[98] FEP Working Paper No. 228.

[99] Rondinelli, D.A (1990) Housing the urban poor in developing countries: other policy options for national Shelter

strategies are examined since conventional ones are inadequate, American journal of Economics and Sociology,

49(3), pp. 257–269.

[100] Sengupta, U., 2005. Government intervention and public –private partnerships in housing delivery in kolkata

international, p.14.

[101] Sfakianakis, E. & van de laar, M., 2013. Fiscal effects and public risk in public –private partnerships. Built

environment project and asset management, 3(2) pp. 181-198.

[102] Shelter Afrique (2008) Mortgage financing for increased access to housing in Africa, Symposium organized

jointly by Shelter Afrique and the Ministry of Housing, republic of Togo, Lome, 2018).

[103] Stonehouse, J. H., Hudson, A. R. and O’Keefe, M. J. (1996). Private-Public Partnerships: The Toronto Hospital

Experience. Canadian Business Review. Ottawa. 23 (2). pp.17-20.

[104] Tabiti S. & Tiamiyu T. (2002) Housing Policies and Programmes, a seminar paper delivered at a Housing

Seminar of the Centre for Urban and Regional Planning. University of Ibadan, Ibadan.

[105] Taiwo, A. A., Adeboye, A. B. and Aderonmu, P. A. (2014) Housing Finance “The role of the private sector in

Public Private Partnership in Housing delivery for the low-income in Nigeria. International Journal of

Architecture and Urban Development, 4(3), 5-10.

[106] Tam, C.M., 1999. Build-operate transfer model for infrastructure development in Asia: reasons for successes and

failures. International journal of project management, 7, pp.377- 382.

[107] Tiong, R. (1996). ‘CSFs in competitive tendering and negotiation model for BOT projects’. Journal of

Construction Engineering and Management, 122: 3, 205-211.

[108] Tomlinson, F. (2005). Idealistic and pragmatic versions of the discourse of partnership. Organizational Studies,

26(8), 1169–1188.

[109] Trivedi, J & Ajit, I., 2014. A Public private partnership model for provision of housing to urban poor, p, 19.

available at: www.researchgate.net/publication/[accessedJuly 1. 2018].

[110] Ukoje, J.E. & kanu, K.U., 2014 implementation and the challenges of the mass housing scheme in Abuja,

Nigeria, American journal of contemporary research, 4(4), pp. 209-218.

[111] UNCHS. (1992). Global strategy to the year 2000. Nairobi: UNCHS.

[112] UN-HABITAT, 2003a. Slums of the world: The face of urban poverty in the new millennium. Working paper.

Kenya.

[113] UN-HABITAT, 2005. Financing urban shelter: global report on human settlements 2005, Nairobi, Kenya.

[114] UN-HABITAT (2006a) Shelter for all: The potential of housing policy in the implementation of the habitat

agenda, Nairobi: UN-HABITAT Information Services Section.

[115] UN-HABITAT (2006b). Public–Private Partnerships in enabling shelter strategies. Nairobi: United.

[116] UN-HABITAT (2010). The State of African Cities 2010-Governance, Inequality, Urban Land Markets. Nairobi:

United Nations Human Settlements Programme.

[117] UN-HABITAT, 2011. Public-Private Partnerships in Housing and Urban Development. United Nations H human

Settlements Programme Nairobi.

[118] United nations economic commission for Europe. 2008. Guide book on promoting good governance in public –

private partnerships, Geneva, Switzertural United Nations.

[119] United Nations. 2014. World urbanization prospects: the 2014 revision highlights. New York: United Nations.

[120] Van Ham, H., & Koppenjan, J. (2001). Building Public-Private Partnerships: Assessing and managing risks in

port development. Public Management Review, 3 (4), 593-616.

[121] Woetzel, J., Ram, S., Mischke, J., Garemo, N. & Sankhe, S. 2014. A blueprint for addressing the global

Affordable housing challenge. McKinsey Global Institute.

[122] World Bank 1993. Housing: Enabling markets to work. A World Bank policy paper. Washington DC.: The

World Bank.

[123] World Bank 2009. Attracting Investors to African Public-Private Partnerships: A Project Preparation Guide.

Washington DC: The World Bank, ICA and PPPIAF.

[124] Wibowo, A. and Alfen, H. W., 2014. Identifying macro-environmental critical success factors and key Areas for

improvement to promote public-private partnerships in infrastructure. Engineering, Construction and

Architectural Management, 21(4), pp.383–402.

[125] Wibowo, A.& aifen, H.W., 2015. Government-led critical success factors in ppp infrastructured Development.

Built environment project and asset management, 5(1), pp. 121-134.

[126] Xie, Q. & Stough, R. (2002) Public–Private partnerships in urban economic development and prospects of their

applications in China. Paper for the International Conference on Transitions in Public Administration and

Governance, Beijing.

[127] Zhang, X., 2005b. Criteria success factors for public private partnerships infrastructure development. Journal of

construction engineering management, 131(1), pp.3-14.

[128] Zhang, X.Q. & kumaraswamy, M.M., 2001. hong kong experience in ma BOT projects. Journal Of construction

engineering and maning march/ april, pp. 154-162.

[129] Zantke G. and Mangels B, (1999) "Public sector client‐private sector project: transferring the state Construction

administration into private hands", Engineering, Construction and Architectural Management, Vol. 6 Issue: 1,

pp.78-87.

Downloads

Published

30.04.2020

How to Cite

Ahmed, Y., & Atan Bin Sipan, I. (2020). Public Private Partnership for Affordable Housing in Abuja Nigeria: A Review. International Journal of Psychosocial Rehabilitation, 24(2), 2044-2058. https://doi.org/10.61841/xcs8gt48