The Effect of Indonesian Government Rationalization Policy on the Investment Feasibility of the Solo-Mantingan-Ngawi Toll Road
DOI:
https://doi.org/10.61841/x0qj6059Keywords:
Government Policy,, Rate Rationalization, Investment FeasibilityAbstract
The government policy to reduce rates for the Solo-Mantingan-Ngawi toll road from Rp 1,300/km to Rp 1,000/km was stipulated in the Decree of the Minister of Public Works and Public Housing Number: 56/KPTS/M/2019 on January 14, 2019. This decree concerns the determination of motor vehicle classes and toll rates on the Solo-Mantingan-Ngawi Toll Road. This study analyzed the relationship between government policy for determining toll rates and its effect on investment feasibility.The analysis revealed that by changing toll rates, the investment feasibility of the Solo-Mantingan-Ngawi toll road was adversely affected. The Internal Rate of Return (IRR) value decreased from 15.73% to 13.58%, and the Net Present Value (NPV) decreased from Rp 5,495,247 million to Rp 1,357,181 million, with a cash flow deficit that increased from Rp 3 trillion to Rp 10.38 trillion. The payback period also increased from 14 years 5 months to 15 years. A review of the literature regarding the applicable rules revealed that the Indonesian government policy of reducing the Solo-Mantingan-Ngawi toll rate from Rp 1,300/km to Rp 1,000/km significantly affected the investment feasibility of the Solo-MantinganNgawi toll road. This policy reduced the initial cash flow for business entities involved in the project as they experienced a large cash deficit. By understanding the conceptual model, this study provided insights into the effects of government policy, especially in determining the Solo-Mantingan-Ngawi toll road rate and the investment feasibility of the toll road. Additionally, the conceptual model developed in this study is expected to provide an overview of the application of government policy for toll road investment businesses and other fields of investment.
Downloads
References
[1] Afriyadi, A.D. (2018). TurunRp 300, Tarif Tol Solo-NgawiJadiRp 1.000/Km.Detik Finance. Retrieved fromhttps://finance.detik.com/berita-ekonomi-bisnis/d-3994318/turun-rp-300-tarif-tol-solo-ngawi-jadi-rp- 1000km?_ga=2.192680874.183197830.1530892573-549201635.1503901049 on February 25th, 2019.
[2] Badan Pengatur Jalan Tol. (2017). Berita Acara PerubahanRencana Usaha Pengusahaan Jalan Tol Solo- Mantingan-NgawiNomor: 184/BA/Pt.6/2017 onSeptember 15th, 2017. Jakarta: BPJT.
[3] Kementerian PekerjaanUmum dan Perumahan Rakyat Republik Indonesia. (2005). Pd T-01-2005-B tentang Analisis Risiko Investasi Jalan Tol. Jakarta: Menteri PUPR RI.
[4] Kementerian Pekerjaan Umum dan Perumahan Rakyat Republik Indonesia. (2018). Keputusan Menteri Pekerjaan Umum Nomor: 306/KPTS/M/2018 dated 23 April 2018 tentang Penetapan Golongan Jenis Kendaraan Bermotor dan Besaran Tarif Tol Pada Jalan Tol Solo-Mantingan-Ngawi Segmen IC Ngawi-Ngawi. Jakarta: Menteri PUPR RI.
[5] Kementerian Pekerjaan Umum dan Perumahan Rakyat Republik Indonesia. (2019).Keputusan Menteri Pekerjaan Umum Nomor: 56/KPTS/M/2019 tanggal 14 Januari 2019 tentang Penetapan Golongan Jenis Kendaraan Bermotor dan Besaran Tarif Tol Pada Jalan Tol Solo-Mantingan-Ngawi. Jakarta: Menteri PUPR RI.
[6] Pemerintah Republik Indonesia. 2005. Peraturan Pemerintah Republik Indonesia Nomor 15 Tahun 2005 Tentang Jalan Tol. Jakarta: Presiden RI.
[7] Prasetyanto, D. & Akmalah, E. (2013). Model Hubungan Antara Volume Lalu Lintas dengan Tarif Jalan Tol.
Jurnal Transportasi, Vol. 13 No. 3 December: 175-182.
[8] Pratiwi, A. (2016). Analisis Risiko Finansial Investasi Jalan Tol Akibat Perubahan Inflasi (Studi Kasus: Jalan Tol Nusa Dua-Ngurah Rai-Benoa). Jurnal Momentum, Vol. 18 No. 2. ISSN: 1693-752X.
[9] PresidenRepublik Indonesia. (2004). Undang-UndangRepublik Indonesia Nomor 38 Tahun 2004 Tentang Jalan. Jakarta: Presiden RI.
[10] Wibowo, A. (2012). InflasidalamAnalisisFinansialInvestasi Jalan Tol: Perlakuan dan Pengaruhnyabagi Badan Usaha dan Pemerintah. Jurnal Teknik SipilJurnalTeoretis dan TerapanBidangRekayasaSipil, Vol. 19 No. 1. ISSN 0853-2982.
[11] Zemskov, E., Lucas, R., Verin, A.D., Umapathy, N.S.P2Y receptors as regulators of lung endothelial barrier integrity(2011) Journal of Cardiovascular Disease Research, 2 (1), pp. 14-22.
[12] Prasenjit Mondal, Shravanthi Nannapu, Pooja Adi, Swapna Naredla, Harish Peruka (2016) A Review On Duopa–A New Antiparkinsonian Combination As Enteral Suspension. Journal of Critical Reviews, 3 (2), 1-5.
[13] Sarvade, P.G., Shet, P.R.Geotechnical Properties of Problem Clay Stabilized with Crumb Rubber Powder(2012) Bonfring International Journal of Industrial Engineering and Management Science, 2 (4), pp. 27-32
[14] Dotta, B.T., Mulligan, B.P., Hunter, M.D., Persinger, M.A. Evidence of macroscopic quantum entanglement during double quantitative electroencephalographic measurements of friends vs strangers(2009) NeuroQuantology, 7 (4), pp. 548-551.
[15] Anand Nayyar, Dac Binh Ha, Ranbir Singh Batth, G. Sussendran, ”Opportunistic Networks: Present Scenario- A Mirror Review” International Journal of Communication Networks and Information Security (IJCNIS), Vol. 10, No. 1, pp.223-241April 2018 (UGC Approved Journal List No. 2747)
[16] M. Almulhim, and N. Zaman, “Proposing secure and lightweight authentication scheme for IoT based E-health applications”, 2018 20th International Conference on Advanced Communication Technology (ICACT), 481- 487.
Downloads
Published
Issue
Section
License

This work is licensed under a Creative Commons Attribution 4.0 International License.
You are free to:
- Share — copy and redistribute the material in any medium or format for any purpose, even commercially.
- Adapt — remix, transform, and build upon the material for any purpose, even commercially.
- The licensor cannot revoke these freedoms as long as you follow the license terms.
Under the following terms:
- Attribution — You must give appropriate credit , provide a link to the license, and indicate if changes were made . You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
- No additional restrictions — You may not apply legal terms or technological measures that legally restrict others from doing anything the license permits.
Notices:
You do not have to comply with the license for elements of the material in the public domain or where your use is permitted by an applicable exception or limitation .
No warranties are given. The license may not give you all of the permissions necessary for your intended use. For example, other rights such as publicity, privacy, or moral rights may limit how you use the material.