Saravanakumar, S. “Simultaneous Scheduling of Assembly and Production Shops Using GA Based Heuristic”. International Journal of Psychosocial Rehabilitation, vol. 24, no. 4, June 2020, pp. 6128-39, https://doi.org/10.61841/tfx65e56.