[1]
A. Sakanurizal, K. R. Ramdhani, F. Sukmawati, I. Nugraha, and A. Rahmana, “Comparison of Inventory Control with P and Q Model for Ppe At Power Plant Industry (Case Study: Pt. Pjb Ubjom Pltu Indramayu)”, Psychosocial rehabilitation, vol. 24, no. 7, pp. 2774–2781, Sep. 2020, doi: 10.61841/cs00ps55.