[1]
S. Saravanakumar, “Simultaneous Scheduling of Assembly and Production Shops Using GA based Heuristic”, Psychosocial rehabilitation, vol. 24, no. 4, pp. 6128–6139, Jun. 2020, doi: 10.61841/tfx65e56.