Saravanakumar, S. 2020. “Simultaneous Scheduling of Assembly and Production Shops Using GA Based Heuristic”. International Journal of Psychosocial Rehabilitation 24 (4): 6128-39. https://doi.org/10.61841/tfx65e56.