“WORKLOAD ANALYSIS USING THE FULL-TIME EQUIVALENT METHOD IN THE RAW MATERIAL QUALITY CONTROL DEPARTMENT OF AN INDONESIAN PHARMACEUTICAL COMPANY”. 2020. International Journal of Psychosocial Rehabilitation 24 (1): 3763-71. https://doi.org/10.61841/jfatrd32.