WORKLOAD ANALYSIS USING THE FULL-TIME EQUIVALENT METHOD IN THE RAW MATERIAL QUALITY CONTROL DEPARTMENT OF AN INDONESIAN PHARMACEUTICAL COMPANY. (2020). International Journal of Psychosocial Rehabilitation, 24(1), 3763-3771. https://doi.org/10.61841/jfatrd32