(1)
WORKLOAD ANALYSIS USING THE FULL-TIME EQUIVALENT METHOD IN THE RAW MATERIAL QUALITY CONTROL DEPARTMENT OF AN INDONESIAN PHARMACEUTICAL COMPANY. Psychosocial rehabilitation 2020, 24 (1), 3763-3771. https://doi.org/10.61841/jfatrd32.