[1]
Sakanurizal, A. et al. 2020. Comparison of Inventory Control with P and Q Model for Ppe At Power Plant Industry (Case Study: Pt. Pjb Ubjom Pltu Indramayu). International Journal of Psychosocial Rehabilitation. 24, 7 (Sep. 2020), 2774–2781. DOI:https://doi.org/10.61841/cs00ps55.