[1]
Saravanakumar, S. 2020. Simultaneous Scheduling of Assembly and Production Shops Using GA based Heuristic. International Journal of Psychosocial Rehabilitation. 24, 4 (Jun. 2020), 6128–6139. DOI:https://doi.org/10.61841/tfx65e56.